Services

SL No Title & Reference No. Procuring Entity Publication Date Closing Place
21 Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway and Construction of Service Lane on both sides
35.01.8487.450.AIIB.2018-610
Superintending Engineer, RHD 11/11/2018 20/11/2018
4:00 PM
Dhaka
22 Consultancy Services for Feasibility Study and Detailed Design of Construction of Kewatkhali Bridge over the river Brahmaputra at Mymensingh with Railway Overpass and Approach (including Service Road) Road.
Memo No: 35.01.8487.450.AIIB.2018-611
Superintending Engineer, RHD 11/11/2018 20/11/2018
4:00 PM
Dhaka
23 Design Review and Enhancement for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway and Construction of Service Lane on both sides
35.01.8487.450.AIIB.2018-610
A.K. Mohammad Fazlul Karim 11/11/2018 20/11/2018
4:00 PM
Dhaka
24 Consultancy Services for Feasibility Study and Detailed Design of Construction of Kewatkhali Bridge over the river Brahmaputra at Mymensingh with Railway Overpass and Approach (including Service Road) Road.
35.01.8487.450.AIIB.2018-611
A.K. Mohammad Fazlul Karim 11/11/2018 20/11/2018
4:00 PM
Dhaka
25 International Individual Consultant: Coal Mine Consultant for “To find out the necessity of Open Cut Mine Feasibility Study at the Northern and the Southern Side of Barapukuria Coal Basin considering previous feasibility study reports undertaken by Barapukuria Coal Mining Company Limited and other aspects.”
BCMCL/300/330/52/1769
Managing Director, Barapukuria Coal Mining Company Limited 01/11/2018 15/11/2018
12:00 PM
Dinajpur
26 Establishment of 99 Composite Brigade for Safety and Security of Padma Multipurpose Bridge Project.
600/15/70/2018-2019/E-6
E in C 04/11/2018 15/11/2018
12.00PM
Dhaka
27 Selection of Consultancy services in connection with carrying out of Preparing Plan & Design for Creation of Tourism Centre at adjacent area of Sheikh Hasina Bridge of Mohananda, Chapai Nawabganj.
30.32.0000.060.14.024.2018
Bangladesh Parjatan Corporation (BPC) 29/10/2018 15/11/2018
12:00 PM
Dhaka
28 Hiring of firm for Design, Management and Supervision of Construction Works
NATP-2/PIU-BARC-19/2018/14350
Project Implementation Unit( PIU), NATP-2, Bangladesh Agricultural Research Council 29/10/2018 14/11/2018
02.00 PM
Dhaka
29 Selection of international consultancy firm to conduct feasibility study to improve voltage profile and power factor of distribution network of DPDC through installation of appropriate size capacitor banks at optimum locations.
87.402.105.01.00.182.2018.335
Chief Engineer, Planning & Design, DPDC 17/10/2018 14/11/2018
12:00 PM
Dhaka
30 Selection of international consultancy firm to conduct feasibility study to improve voltage profile and power factor of distribution network of DPDC through installation of appropriate size capacitor banks at optimum locations.
2018.335
Chief Engineer, Planning & Design, DPDC 27/09/2018 14/11/2018
12.00
Dhaka
31 Consulting Firm of India for following services for the purpose of Consultancy Services for Feasibility study with Detailed Engineering Design , Bidding Services and Construction Supervision and Services During Defect liability for Construction of Double Line Track Between Khulna-Darsana Junction Section of Bangladesh Railway. a. Phase-1: Feasibility Study, Detail Design and Tendering Services as per TOR b. Phase-2 Construction Supervision Services including defect liability period as per TOR
54.01.8100.155.05.026.18
Chief Engineer (West) & Project Director, Bangladesh Railway, Rajshahi. 17/10/2018 13/11/2018
12:30 Hours
Rajshahi
32 Consulting firm for conducting following services for the purpose of Consultancy Services for Feasibility study with Detailed Engineering Design , Bidding Services and Construction Supervision and Services During Defect liability for Conversion of Metre Gauge Line into Dual Gauge Line from Parbatipur to Kaunia Section of Bangladesh Railway. a. Phase-1: Feasibility Study, Detail Design and Tendering Services as per TOR b. Phase-2 : Consultancy Services for Construction Supervision Services including defect liability period as per TOR
54.01.8100.155.05.025.18
Chief Engineer (West) & Project Director, Bangladesh Railway, Rajshahi. 17/10/2018 13/11/2018
12:30 Hours
Rajshahi
33 Selection of Individual National Consultant (Field Engineer -1 nos, Assistant- Field Engineer -4 nos, Consultant for Large Bridge Design-1 nos)
46.02.0000.915.11.003.18.898
Project Director, Greater Dhaka Rural Infrastructure Improvement Project-3(GDP-3) 23/10/2018 13/11/2018
3.00 pm
Dhaka
34 Design and Supervision Consultancy Services
46.02.0000.736.11.004.18-400
Project Director, Construction of Bridge over Teesta River in Gaibandha 09/10/2018 12/11/2018
2.00 PM (BST)
Dhaka
35 Feasibility Study of Route-01 of Middle Ring Road Southern Part (Package No.P-01) (Route-01 : Hemayetpur (Dhaka-Aricha Highway) to Kalakandi (Dhaka-Mawa Highway), Approx. Length = 18.00 KM).
EOI/DZ-01/Middle Ring Road Southern Part (P-01)/2018-2019
Additional Chief Engineer, RHD, Dhaka Zone, Allenbari, Tajgaon, Dhaka-1215. 24/10/2018 11/11/2018
12:00 PM
Dhaka
36 Consulting Firm/Research Organization
MoHFW/HSD/HEU/GNSPU/Research/07/2018
Gender, NGO & Stakeholder Participation (GNSP) Unit 01/11/2018 11/11/2018
3:00 PM
Dhaka
37 Feasibility Study for Connection from Dhaka-Mawa (N.B) Road to Dhaka-Aricha (N-5) and Dhaka-Mawa (N-8) road to Dhaka-Chittagong (N-1) Road (Southern part of Middle Ring Road)
EOI/DZ-02/Middle Ring Road Southern Part (P-02)/2018-19
Additional Chief Engineer, RHD, Dhaka Zone, Dhaka 15/10/2018 11/11/2018
12:00 PM
Dhaka
38 Selection of a Consulting Firm for Construction of a New Building for Nazrul Institute at Dhaka & Renovation of Existing Buildings at Dhaka, Mymensingh and Comilla
??/??????-?(??)/????(???-?)/384
Project Director (Deputy Secretary), Construction of a New Building for Nazrul Institute 24/10/2018 10/11/2018
3:00 PM
Dhaka
39 Haor Flood Management and Livelihood Improvement Project (HFMLIP)
01/2018-19
Project Director, Haor Flood Management and Livelihood Improvement Project (HFMLIP) 23/10/2018 08/11/2018
2:00 PM
Dhaka
40 i.Community Infrastructure Coordination Expert (CICE) ii.Community Resource Management Coordination Expert (CRMCE)
46.02.0000.741.07.003.18.325
Project Director, Haor Flood Management and Livelihood Improvement Project (HFMLIP) 14/10/2018 08/11/2018
2.00pm
Dhaka