1 |
Repair and maintenance of 33 Nos. Digital Weighbridge Scales and 1500 Digital Platform Scale made by Precia Molen, France on quarterly basis for 03 (three) years located at different LSD(s) & CSD(s) & Silo(s) under the Directorate General of Food, and supply of required spare parts on demand.
13.01.0000.111.38.003.25.202
|
Director General of Food |
21/05/2025 |
18/06/2025
01:00 PM
|
Dhaka |
2 |
The Universal Ticketing System (UTS) for Single Journey on Dhaka Metro Rail Line-6.
35.05.0000.022.07.023.25-912
|
General Manager (Store & Procurement) |
26/05/2025 |
30/06/2025
03:00 PM
|
Dhaka |
3 |
Earth Work, Construction of Flexible Pavement, RCC Box Culvert (05 Nos) & Bridge (2 Nos), Drain and Protective work from 20th (p) km (Ch.19+880m) to 27th (p) (Ch.26+890m) km of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (korikandi to Bancharampur - Nabinagar) under Road Division, Brahmanbaria during the year 2024-2025.
e-GP/BRD/ADP/BABNSR and SNL/WP-01//2024-2025
|
Executive Engineer,Road division,Brahmanbaria. |
22/05/2025 |
19/06/2025
12:00 PM
|
Brahmanbaria |
4 |
Construction of HBB branch road at Patuakhali EPZ Project (package BEP
03.06.7895.325.14.123.2025-241
|
Project Director, Patuakhali Export Processing Zone Project, BEPZA, Dhaka |
24/05/2025 |
26/06/2025
12:00 PM
|
Dhaka |
5 |
3757
|
Executive Engineer, PWD E/M Division-4, Bangladesh Secretariat, Dhaka. |
28/05/2025 |
18/06/2025
02:30 PM
|
Dhaka |
6 |
Supply, Installation, Testing and Commissioning of Optical Fiber Cable Network
14.33.0000.315.07.025.25.48
|
Project Director, Development of Optical Fiber Transmission Network of BTCL for 5G Readiness Project |
27/05/2025 |
19/06/2025
02:30 PM
|
Dhaka |
7 |
Part-A: Estimate For The Laying of 1-500 mm dia uPVC Buried Pipe Main Line Zero Point Header Tank to LoilaPond ( A-F; Ch. 0+000 Km to Ch. 1+605 Km, Length=1605m) with Ancillary Works. Part-B: Estimate For The Laying of 1-315 mm dia uPVC Buried Pipe Branch Line Monju Shekh to South Side Md. Ahamuddul land (D1-D2;Length= 190m with Ancillary Works under Palsha Moheshpur Cad Sub-Project(SP No: 25241) Under Sadar Upazila, Dist: Chapainawabganj.
APP ID : 205161
|
Executive Engineer, LGED, Chapainawabganj |
15/05/2025 |
16/06/2025
11:30 AM
|
Chapai Nawabganj |
8 |
Part-A: Laying of 1-400 mm dia uPVC Main Line Bagmara Pond to Jam Pukur (Ch. 1+710 Km to Ch. 2+710 Km, Length= 1000 m) with Ancillary Works. Part-B: Laying of 1-355 mm dia uPVC Branch Line at Ch.1+000 Km of Main Line Abul Fajor House to Md. Dulal Deep (Length- 500 m) and at Ch. 1+610 Km of Main Line Khineetala More to Serajul Deep (Length 500 m) Total Length 1000 m with Ancllary Works. Part-C: Construction of RCC Open Canal (600mmx600mm) Abdul Ismail land to Md. Belal land mango garden (Length 500 m) and Jam pukur par platform slab (6m X3m) under Chapai Grameen Cad Sub-Project (SP No: 25289) Under Sadar upazila, Dist: Chapainawabganj.
APP ID : 205161
|
Executive Engineer, LGED, Chapainawabganj |
15/05/2025 |
16/06/2025
11:30 AM
|
Chapai Nawabganj |
9 |
Construction of RCC Road with boundary wall & gate from Govt. Vehicle
Workshop to Phoenix Road at Osmani Udyan, Dhaka.
eGP/Eden/ACE4/SDE1/2024-25/TTender-001
|
Executive Engineer, Eden Bhaban PWD Division, Bangladesh Secretariat, Dhaka. |
|
29/05/2025
01:00 PM
|
Dhaka |
10 |
City/R2/Fund/JATI DG Banglow/2024-25
|
Executive Engineer, City PWD Division |
08/05/2025 |
26/05/2025
02:00 PM
|
Dhaka |