131 |
Hiring of Consulting firm (International) to provide Top Drive Service Engineer
Bapex/Admin/Int/Ten- 1036/2021
|
General Manager ( Administration Division) |
26/09/2021 |
26/10/2021
12.00pm
|
Dhaka |
132 |
Selection of Consulting firm (International) for Top Drive service Engineer
BAPEX/ADMIN/INT/TEN-1041/2021
|
General Manager (Administration) |
23/09/2021 |
25/10/2021
12.30 PM
|
Dhaka |
133 |
3D Seismic Survey at the relinquished area of acreage block-13 & 14 under Sylhet Gas Fields Limited (SGFL)
SGFL/3D/Block-13-14/EOI/Seismic/P&D-10
|
Sylhet Gas Fields Limited (SGFL) |
18/09/2021 |
10/10/2021
12:00 hrs (BST)
|
Sylhet |
134 |
Appointment of Consulting Firm for Pre-Feasibility and Detail Feasibility Study to Develop Off Shore Wind Farm in Bangladesh
27.00.0000.085.11(06).31.21 -1020
|
Project Director, BPSDCB Project |
14/09/2021 |
14/10/2021
12:30 PM
|
Dhaka |
135 |
Companies that are deemed best suited to revisit/re-entry of some dry, suspended and abandoned wells located all over Bangladesh in order to bring them into production after proper evaluation, followed by development proposal on Joint Venture with BAPEX. The operation may require seismic data acquisition, processing, interpretation and well data/well log/DST data analysis followed by conventional /horizontal drilling/ fracturing recompletion etc.
BAPEX/ADMIN/INT/TEN-1040/2021
|
General Manager (Administration) |
18/08/2021 |
28/09/2021
28-09-2021
|
Dhaka |
136 |
Appointment of Consulting Firm for Establishment of Building Energy Efficiency Rating System for SREDA
27.00.0000.085.11(08).41.21 -968
|
Project Director, BPSDCB Project |
05/08/2021 |
09/09/2021
12:30 PM
|
Dhaka |
137 |
Selection of consulting firms for Survey, Design, Staking & Construction Supervision of Electrical Lines and Sub-stations of the project.
27.12.0000.022.48.475.21. 38
|
Director, System Engineering & Design Directorate. |
18/07/2021 |
08/08/2021
12.00 noon (BST)
|
Dhaka |
138 |
-
27.00.0000.085.11(07).32.21-958
|
Power Division |
03/07/2021 |
12/08/2021
03:00 PM
|
Dhaka |
139 |
1. Social Assessment Surveys
2. Preparation Upgradatin and Implementation and Monitoring of Resettement Plan
27.21.0000.101.07.310.21.2403
|
Autonomous Bodies and Other Institutions |
21/06/2021 |
07/07/2021
5:00 pm
|
Dhaka |
140 |
Installation of MET Masts for Wind Data Collection
27.02.0000.000.07.001.21-108
|
Project Director |
02/06/2021 |
23/06/2021
17:00 Hrs
|
Dhaka |