2911 |
Selection of Consulting Firm (National) for Further Development of Patuakhali Science and Technology University (2nd Phase)
PSTU/PD/FDP (2nd Phase)/01 /2019-2020/01 & SD-01
|
Patuakhali Science and Technology University,Dumki, Patuakhali-8602 |
04/06/2020 |
25/06/2020
02:00 PM
|
Patuakhali |
2912 |
Environmental Impact Assessment (EIA) for the project of (i) ‘Drilling of well no. Kailashtila-8’, (ii) ‘Drilling of well no. Sylhet-10’, (iii) ‘3D seismic survey at Beanibazar Field’ and (iv) ‘3D seismic survey at Relinquished area of acreage Block-13&14’ under Sylhet Gas Fields Limited (SGFL).
SGFL/DP/EOI/EIA/KTL-8/SYL-10/3D BGF/3DBlock 13&14
|
Sylhet Gas Fields Limited, (SGFL). |
04/06/2020 |
28/06/2020
12:00 hrs (BST)
|
Sylhet |
2913 |
Individual Consultant (Time-based).
56.01.0000.029.11.194.17(Part-01)-177
|
Executive Director, Bangladesh Computer Council |
03/06/2020 |
16/06/2020
11:00 AM
|
Dhaka |
2914 |
Selection of international consultancy firm for engineering consultancy service for procurement, implementation, supervision, dissemination, replicability and communication to introduce smart grid under DPDC area on pilot basis.
87.103.105.00.00.008.2015.382; Date: 31/05/2020
|
Chief engineer, Planning & Design, DPDC |
03/06/2020 |
15/07/2020
12 : 00 hours BST
|
Dhaka |
2915 |
Selection of an international consultancy firm to provide Project Management Consultancy Services for Development and Cost Management of a multi storied Commercial Center/Four Star Hotel to be run by a reputed Hotel Operator on behalf of DPDC at the Super Structure Building to be constructed under DPDC’s G to G project at Mogbazar, Hatirjheel, Dhaka
87.102.109.00.00.043.2016.416
|
Project Director (Chief Engineer), ‘Expansion and Strengthening of Power System Network under DPDC Area’ project (G to G), DPDC . |
01/06/2020 |
06/07/2020
12 : 00 hours BST
|
Dhaka |
2916 |
Consulting Firm for conducting the feasibility study for the establishment of a Treatment Storage & Disposal Facility (TSDF) for Ship Recycling Industry & others in Chattogram
36.00.0000.061.14.014.20-01
|
Project Director, ‘Feasibility Study for the Establishment of Treatment Storage & Disposal Facility (TSDF) for Ship Recycling Industry & others in Chattogram’ Project’ |
01/06/2020 |
14/06/2020
12:00 PM
|
Dhaka |
2917 |
An Independent National Consultant/Technical Adviser for the Feasibility Study for the establishment of a Treatment Storage & Disposal Facility (TSDF) for Ship Recycling Industry & others in Chattogram
36.00.0000.061.14.014.20-02
|
Project Director, ‘Feasibility Study for the Establishment of Treatment Storage & Disposal Facility (TSDF) for Ship Recycling Industry & others in Chattogram’ Project’ |
01/06/2020 |
14/06/2020
12:00 PM
|
Dhaka |
2918 |
Consultancy Services for Feasibility Study for follow up future urban operation in Bangladesh [(following on Municipal Governance and Services Project (MGSP)]
MGSP/PMU/S-17 & 46.02.0000.794.14.001.20
|
Project Director Municipal Governance and Services Project (MGSP) Local Government Engineering Department LGED-RDEC Bhaban (level -5), Agargaon, Sher-e-Bangla Nagar |
19/05/2020 |
07/07/2020
05:00 PM
|
Dhaka |
2919 |
Request for Expression of Interest (REOI) for Design, Supervision and Monitoring Consultancy Firm.
46.02.0000.949.99.007.2020.81
|
Project Director, LGED HQ, Dhaka |
19/05/2020 |
22/06/2020
5.00pm
|
Dhaka |
2920 |
SD-1 :Development of Apps, Web Design, Hosting and Maintenance for ‘Payra-Kuakata’ Comprehensive Plan
SD-2 : Survey by acquisition of satellite Image for ‘Payra-Kuakata’ Comprehensive Plan
UDD/PKCP/EOI/2019-20/02
|
Director, Urban Development Directorate |
17/05/2020 |
02/06/2020
2:00 pm
|
Dhaka |