6021 |
Tender No. 36.01.0000.974.11.001.19/69 dt: 15/05/2019
Supply of Physical Services of 18(Eighteen) nos. Sub-Assistant Engineer (Civil) (Grade-10), 03(Three) nos. Sub-Assistant Engineer (Electrical) (Grade-10), 02(Two) nos. Driver (Grade-16), 02(Two) nos. Office assistant cum Computer Typist(Grade-16), 03(Three) nos. Office Assistant (Grade-20) from any Competent Organization under Outsourcing for the Project “Construction of 34 nos Buffer Godown at different Places of the Country for Reservation & Distribution of Fertilizer”
36.01.0000.974.11.001.19/69
|
Construction of 34 nos Buffer Godown at different Places of the Country for Reservation & Distribution of Fertilizer”project |
15/05/2019 |
17/06/2019
11:30 AM
|
Dhaka |
6022 |
Carrying, unloading and stacking of 50,000 MT (AFCCL=30,000 MT, UFFL= 20,000 MT) Urea Fertilizer in bagged from Shahjalal Fertilizer Company Ltd. (SFCL) Fenchuganj, Sylhet to AFCCL & UFFL Factory Godown.
36.01.000.05.25-1.0404.2019/78
|
Shahjalal fertilizer Company Ltd |
15/05/2019 |
15/06/2019
11:30 AM
|
Sylhet |
6023 |
Construction of 20 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-06 remaining works -5a.7
18/rnpp/remaining-2/20.st/bldg-5a.7/2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
16/06/2019
04:00 PM
|
Pabna |
6024 |
Construction of 16 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-13 remaining works -5.4
14/rnpp/remaining-2/16.st/bldg-5.4 /2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
17/06/2019
10:45 PM
|
Pabna |
6025 |
Construction of 16 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-12 remaining works -5.3
13/rnpp/remaining-2/16.st/bldg-5.3 /2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
17/06/2019
11:00 AM
|
Pabna |
6026 |
Construction of 20 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-14 remaining works -5a.3
17/rnpp/remaining-2/20.st/bldg-5a.3/2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
17/06/2019
11:15 AM
|
Pabna |
6027 |
Estimate for Construction of 16 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-11 remaining works -5a.4
16/rnpp/remaining-2/20.st/bldg-5a.4/2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
17/06/2019
11:00 AM
|
Pabna |
6028 |
Construction of 16 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-02 remaining works -5.5
15/rnpp/remaining-2/16.st/bldg-5.5/2018-2019
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
17/06/2019
11:30 AM
|
Pabna |
6029 |
Construction of 16 storied Residential Building with 20 storied foundation Six unit in each floor 1250 Sft each unit under the Project Construction of Ruppur Nuclear Power Plant Sub Head Supplying & manufacturing fitting fixing kitchen cabinet Special type of tiles Special type of Aluminium door and windows shutter 6mm distortion free glass with rubber Open terrace railing LED light fitting emergency safety fenching etc. in building no-13 remaining works -5.4
318719
|
Executive Engineer, PWD Division Pabna |
16/05/2019 |
27/06/2019
10:15 AM
|
Pabna |
6030 |
Vertical extension of Pabna PWD Office building first floor over existing ground floor for accommodating new Pabna PWD Circle office in/c Civil sanitary & E/M Works. FY 2018-19
01/e-gp-pabna/OTM/PWDCircle Pabna office/FY2018-19
|
PWD Division, Pabna |
15/05/2019 |
10/06/2019
10:30 AM
|
Pabna |