541 |
Ministry of Post, Telecommunications & Information Technology
Teletalk Bangladesh Limited
|
14.35.0000.460.07.004.22/108 Date:25-06-2023
Notification of Award
|
Supply of Goods and related Services for supply Installation and integration of Telecom Equipment |
ZTE Corporation |
ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R China |
18/10/2023 |
|
542 |
Ministry of Road Transport and Bridges
Dhaka Transport Co-ordination Authority (DTCA)
|
35.02.0000.008.35.021.22-391
Notification of Award (NoA) for Procurement of Rapid Pass (FeliCa IC) Card, SAM (Secure Access Module) and Associated Service of Clearing House Project
|
This is to notify you that, your Tender dated 15/06/2023, which was submitted for ‘Procurement of Rapid Pass (FeliCa IC) Card, SAM (Secure Access Module) and Associated Service’ bearing a total value of price of Tk. 3,28,25,000/- (in words: Taka Three-Crore Twenty-Eight Lac Twenty-Five Thousand Only) including VAT & TAX (deductible at source) has been accepted and approved by the Procuring Entity.
Therefore, you are requested to:
i. Accept in writing the NoA within Seven (7) working days of its issuance pursuant to ITT Sub Clause 62.3.
ii. Furnish a Performance Security in the form of Bank Guarantee or Pay-Order (Original Copy) from any scheduled bank bearing not less than the amount of Tk. 32,82,500/- (In words: Taka Thirty-Two Lac Eighty-Two Thousand and Five Hundred Only) within 14 (Fourteen) days of acceptance of this NoA in accordance with ITT Clause 64.2. The Beneficiary would be ‘The Project Director, Establishment of Clearing House for Integrating Transport Ticketing System in Dhaka City Adjacent Districts (Phase–II) PROJECT’.
iii. Sign the Contract within 21 (Twenty-One) days of issuance of this NoA in accordance with ITT Sub Clause 67.2.
iv. Supply all the listed goods and complete related services within 4 (Four) months of signing the contract agreement as per Clause-30.
You may proceed with the execution of the said Contract in accordance with the Contract documents only upon completion of the tasks bearing Serial-(i) to Serial-(iii). You may also please note that, this Notification of Award (NoA) will constitute the formation of this Contract, which shall become binding upon you.
|
SK Farid Ahmed, Managing Director, Silkways Card and Printing Ltd |
158/C, Tejgaon Industrial Area, Dhaka-1208 |
16/10/2023 |
|
543 |
Ministry of Post, Telecommunications & Information Technology
Bangladesh computer Council (BCC)
|
56.01.0000.046.07.018.22-1374
EDGE-S9
|
Development of the National Job Portal |
Synesis-Bdjobs-SCSL JV |
Level-3, BDBL Bhaban, 12 Kawran Bazar, Dhaka-1215, Bangladesh |
09/10/2023 |
|
544 |
Ministry of Local Government, Rural Development and Co-operatives
Department of Public Health Engineering (DPHE)
|
46.03.2600.000.02.001.18-7090
Notification Of Award (NOA).
|
Supplying of different software with installation of accessories for DPHE and the Pourashavas under Urban Water Supply and Sanitation in 23 Pourashavas Project (GOB-IDB)” |
BASE-NOGOR-INVENTION IT JV |
69/1, Bir Uttam Nuruzzaman Road
Dhaka-1205
|
03/10/2023 |
|
545 |
Ministry of Road Transport and Bridges
Roads & Highways Department (RHD)
|
35.01.0000.072.07.67.22-542
CONSTRUCTION AND IMPROVEMENT OF ROAD CORRIDOR FROM JHENAIDAH BUS STAND TO KALIGANJ BAZAR (CH.00+000 To CH. 15+900) WP-01 (LOT-1)
|
The Works under the Lot will consist of:
Phase-1: Construction Phase: Improvement of existing Highway section into 4-Lane with Service Lanes on both Side throughout the road including structures as follows: Road pavement 15.9 km Culvert 22 Nos Bridge 2 Nos Vehicular Overpass (VOP) 3 Nos. Pedestrian Overpass (POP) 2 Nos. Foot Over Bridge 1 Nos. Slope and Embankment Protection Misc. works items of Sign Signal, Guard rail, ITS and OFC, Road Marking etc.
Phase-2: Performance Based Maintenance Works: Consist of all activities to be carried out by the Contractor to achieve and keep the road performance as defined in the Performance Based Maintenance Specifications, and all activities related to their management. In addition to Routine Maintenance Works and Preventive Maintenance works, this also includes Emergency Works consisting of activities needed to reinstate any road asset which might have been damaged as a result of natural or manmade phenomena such as storms, flooding, earthquakes, accidents, etc. as detailed in the Works Requirement Section VII: Technical Specifications. |
Name of Contractor: Joint Venture of Longjian Road & Bridge Co.Ltd. (LRBC) and Max Infrastructure Limited |
Address of Contractor: No: 2, Ganxiao Street, Daoli District, Harbin City, China
Tel: 0086451 87 166150, Email: 81166161 @163.com |
01/10/2023 |
|
546 |
Ministry of Road Transport and Bridges
Roads & Highways Department (RHD)
|
35.01.0000.072.07.68.22-543
CONSTRUCTION AND IMPROVEMENT OF ROAD CORRIDOR FROM KALIGANJ BAZAR TO MURADGOR BAZAR (CH. 15+900 TO CH. 31+700) WP-01 (LOT-2)
|
The Works under the Lot will consist of:
Phase-1: Construction Phase: Improvement of existing Highway section into 4-Lane with Service Lanes on both Side throughout the road including structures as follows: Road pavement 15.80 km Culvert 19 Nos Bridge 1 Nos Vehicular Overpass (VOP) 2 Nos. Pedestrian Overpass (POP) 4 Nos. Slope and Embankment Protection Misc. works items of Sign Signal, Guard rail, ITS and OFC, Road Marking etc. Phase-2: Performance Based Maintenance Works: Consist of all activities to be carried out by the Contractor to achieve and keep the road performance as defined in the Performance Based Maintenance Specifications, and all activities related to their management. In addition to Routine Maintenance Works and Preventive Maintenance works, this also includes Emergency Works consisting of activities needed to reinstate any road asset which might have been damaged as a result of natural or manmade phenomena such as storms, flooding, earthquakes, accidents, etc. as detailed in the Works Requirement Section VII: Technical Specifications. |
Name of Contractor: Joint Venture of Qingdao Traffic Construction Group Co. Ltd. (QTCG) and Abdul Monem Limited (AML) |
Address of Contractor: Monem Business District,111, Bir Uttam C.R. Datta Road, Dhaka-1205
Tel: +88-02-9632011-13, Email: info@amlbd.com
|
01/10/2023 |
|
547 |
Ministry of Road Transport and Bridges
Roads & Highways Department (RHD)
|
35.01.0000.072.07.69.22-544
CONSTRUCTION AND IMPROVEMENT OF ROAD CORRIDOR FROM MURADGOR BAZAR TO JASHORE CHACHRA MOR (CH. 31+700 TO CH. 47+480) WP-01 (LOT-3) To
|
The Works under the Lot will consist of: Phase-1: Construction Phase: Improvement of existing Highway section into 4-Lane with Service Lanes on both Side throughout the road including structures as follows: Road pavement 15.78 km Culvert 14 Nos Bridge 1 No Rail Way Over Pass (ROP) 1 No (2070 m) Elevated Structure 1 No. (332 m) Vehicular Overpass (VOP) 1 No. Pedestrian Overpass (POP) 1 No. Foot Over Bridge 1 No. Slope and Embankment Protection Misc. works items of Sign Signal, Guard rail, ITS and OFC, Road Marking etc. Phase-2: Performance Based Maintenance Works: Consist of all activities to be carried out by the Contractor to achieve and keep the road performance as defined in the Performance Based Maintenance Specifications, and all activities related to their management. In addition to Routine Maintenance Works and Preventive Maintenance works, this also includes Emergency Works consisting of activities needed to reinstate any road asset which might have been damaged as a result of natural or manmade phenomena such as storms, flooding, earthquakes, accidents, etc. as detailed in the Works Requirement Section VII: Technical Specifications. |
Name of Contractor: Joint Venture of Qingdao Traffic Construction Group Co. Ltd. (QTCG) and Abdul Monem Limited (AML) |
Address of Contractor: Monem Business District,111, Bir Uttam C.R. Datta Road, Dhaka-1205
Tel: +88-02-9632011-13, Email: info@amlbd.com
|
01/10/2023 |
|
548 |
Ministry of Industries
Bangladesh Small & Cottage Industries Corporation (BSCIC)
|
36.02.0000.00311.055.23.7513
Letter of Accpetance (LOA)
|
Issuing LOA to the Outsourcing firm (Package No. NCS-1) for manpower supply. |
Arafat Construction |
New 77, Sheikh Rasel Square, Sukrabad, Dhaka-1205 |
01/10/2023 |
|
549 |
Ministry of Commerce
Ministry of Commerce
|
26.00.0000.010.07.201.22/451
Letter of Acceptance
|
Construction of Center of Excellence for Engineering and Technology (CEET) at Bangabandhu Hi-Tech City, Kaliakoir, Gazipur, Bangladesh, Package no. W2’ |
National Development Engineers Ltd. |
House# 22, Road# 4, Block-C, Banani,
Dhaka, 1213, Bangladesh. |
28/09/2023 |
|
550 |
Ministry of Commerce
Ministry of Commerce
|
26.00.0000.010.07.202.22/452
Letter of Acceptance
|
‘Construction of Bangabandhu Design & Technology Center for Leathergoods and Footwear (BDTCLF), Kashimpur, Gazipur, Package no. W4’ |
National Development Engineers Ltd. |
House# 22, Road# 4, Block-C, Banani,
Dhaka, 1213, Bangladesh. |
28/09/2023 |
|