Services

SL No Title & Reference No. Procuring Entity Publication Date Closing Place
1 Preparation of GIS based Maps (Ward Level) at DNCC, DSCC & SCC
46.207.000.09.07.157.2018/1521
Project Director 17/02/2019 28/03/2019
3.30 PM Local Time
Dhaka
2 Consultant for Region (Survey & Supervision Consultant)
46.02.0000.927.14.015.2019.129
Project Director 20/02/2019 20/03/2019
4.00 p.m.
Dhaka
3 Request for Expression of Interest (REOI) for construction of Land-based LNG Re-gasification Terminal at Matarbari, Cox’s Bazar, Bangladesh on BOOT basis.
28.19.0000.701.20.002.19/1478
Rupantarita Prakritik Gas Company Limited (RPGCL) 07/02/2019 20/03/2019
11:45 AM
Dhaka
4 a) Construction of 12-Storied Academic Building -1 (23823.86 Sqm) b) Construction of 12-Storied Academic Building -2 (12541.81 Sqm) c) Construction of 10 Storied Administration Building (9513.20 Sqm) d) Construction of 10 Storied Residential Building for Female Student (14678.56 Sqm) e) Construction of 10-Storied Residential Building for Male Student (14678.56) f) Construction of 4 Storied Auditorium & TSC Building (6976.96 Sqm) g) Construction of 4 Storied Convention Building. (4031.96Sqm) h) Construction of Shahid Minar (371.61Sqm) i) Construction of 2 storied Police station & 4 Storied Workshop building j) Construction of 4 Storied Foundation with 2 Storied Ansar Camp Building ( 371.60 Sqm) k) Construction of 3 Storied Teachers- Officer’s Club. (1532.88 Sqm)
PUST/PD/2018-2019/001
Pabna University of Science and Technology 13/02/2019 17/03/2019
12.00 PM
Pabna
5 Selection of Consultancy services in connection with carrying out of Preparing Plan & Design for Constuction of Tourism Centre at Panchagarh.
30.32.0000.060.14.006.2019
Bangladesh Parjatan Corporation (BPC) 05/02/2019 14/03/2019
12:30 PM
Dhaka
6 Consulting Services for the construction of infrastructure for dredger base like office building for dredger base, ware house & Dormitory building, dredger base officers quarter, staff quarter, along with 1 training Institute and other construction work design, drawing & Supervision in 4 (four) areas.
18.11.0000.311.14.010/2506
Bangladesh Inland Water Transport Authority (BIWTA) 20/02/2019 13/03/2019
12:30 PM
Dhaka
7 Consultancy services for conducting digital topographical survey, sub-soil investigation, preparation of structural design, drawing, cost estimate & land acquisition plan for 51 Nos bridges/culverts & 62 Nos ghat.
46.02.0000.700.11.001.2018.65
Project Director, Khulna, Bagerhat & Satkhira District Rural Infrastructure Development Project 17/02/2019 10/03/2019
1.00 PM
Dhaka
8 Senior Urban Planner (Individual Consultant) for Bangladesh Economic Zones Authority (National).
PS 01(1)-BEZA-2019
Mohammad Shoheler Rahman Chowdury 04/02/2019 10/03/2019
03:00 PM
Dhaka
9 Urban Planner (Individual Consultant) for Bangladesh Economic Zones Authority (National)
PS 01(2)-BEZA-2019
General Manager (Planning& Development), Bangladesh Economic Zones Authority. 04/02/2019 10/03/2019
03:00 PM
Dhaka
10 Design Engineer
46.02.0000.910.11.002.18-1012
Important Rural Infrastructure Improvement Project in Sylhet Division 20/02/2019 07/03/2019
12.30 pm
Dhaka
11 Saidabad Water Treatment Plant Project Phase-III
46.113.620.12.00.099.2018-21
Project Director Saidabad Water Treatment Plant Project Phase-III Dhaka WASA 20/01/2019 05/03/2019
4:00 PM
Dhaka
12 SELECTION OF CONSULTANTS FOR THE DESIGN, TENDERING, AND SUPERVISION OF SAIDABAD III WATER TREATMENT AND SLUDGE TREATMENT PLANTS (COMPONENT 2 OF THE SAIDABAD WTP PHASE III PROJECT), DHAKA, BANGLADESH
46.113.620.11.00.100.2018-20
Project Director Saidabad Water Treatment Plant Project Phase-III Dhaka WASA 23/01/2019 05/03/2019
04:00 PM
Dhaka
13 ICT Training and Infrastructure Establishment Program in Recently Abolished Enclaves : On IT Support Technician (NTVQF*Level-1)
56.04.0000.012.14.004.18-45
Project Director, Deputy Director (planning & development), Department of ICT 14/02/2019 04/03/2019
2:30PM
Dhaka
14 Feasibility study For Construction Of Over Pass at Fulbari Rail Crossing, Khulna.
25.41.0000. 021.0147.18
Feasibility study For Construction Of Over Pass at Fulbari Rail Crossing, Khulna. 18/02/2019 03/03/2019
5:00 pm
Khulna
15 Feasibility study For Construction Of Over Pass at Fulbari Rail Crossing, Khulna.
25.41.0000. 021.0147.18
Khulna Development Authority (KDA) 11/02/2019 03/03/2019
05:00 PM
Khulna
16 Feasibility Study of Environment Friendly Ship Re-cycling Industry at Taltali Upazila in Barguna District
Barguna/SR/001/2019
Project Director, Feasibility Study of Environment Friendly Ship Re-cycling Industry at Taltali Upazila in Barguna District Project 05/02/2019 28/02/2019
4:00 PM
Dhaka
17 Expression of Interest (EOI) for Selection of Consulting firm for 4th Performance Assessment Survey under Upazila Governance and Development Project (UGDP) (Package no. UGDP/SD15)”.
46.6000.007.00.00.004/3.2019.1168
Project Director, Upazila Governance and Development project (UGDP) 13/02/2019 28/02/2019
03:00 PM
Dhaka
18 Consulting firm for conducting of Consultancy Services for Feasibility study, Details Design, Tendering Services, Mathematical Modeling including detail survey for “Construction of Broad Gauge Railway Line From Darshana to Meherpur via Damurhuda & Mujibnagar Section’’
54.01.8100.155.01.205.18
Project Director & Addl Chief Engineer/Bridge (West), Bangladesh Railway, Rajshahi 24/01/2019 28/02/2019
12.30 hours.
Rajshahi
19 Consultancy services for Procurement of 35 Nos. Commercial & 8 nos. Auxiliary vessels and Construction of 2 new Slipway. a) Senior Individual Consultant / Procurement Specialist. b) Junior Individual Consultant / Procurement Specialist.
18.151.2600.013.14.001.19
Project Director (Additional Secretary), MOS Dhaka. 05/02/2019 26/02/2019
12:00 PM
Dhaka
20 Selection of Individual Consultant ( Technical Adviser)
01/2018-2019
Project director, Disaster Damage Rural Road Improvement Project : 3 Hill Districts, Level-10, RDEC Bhaban, LGED, Dhaka-1207. 07/01/2019 25/02/2019
2.00 P.M.
Dhaka