Services

SL No Title & Reference No. Procuring Entity Publication Date Closing Place
1 The institute/organization will provide/share necessary sand mineral processing activities especially from river and beach sands. Expertise required for mineral processing and mineral characterization. Also required for instrumental expertise on EPMA/Automated Mineral Analyzer.
39.02.3847.5006.11.007.17.317
Establishment of Mineral Processing Center at IMMM of BCSIR 18/06/2018 05/08/2018
5.00 PM
Jaipurhat
2 Consulting Firm of India for following services for the purpose of Consultancy Services for Feasibility study with Detailed Engineering Design , Bidding Services and Construction Supervision and Services During Defect liability for Construction of Double Line Track Between Khulna-Darsana Junction Section of Bangladesh Railway. a. Phase-1: Feasibility Study, Detail Design and Tendering Services as per TOR b. Phase-2 Construction Supervision Services including defect liability period as per TOR
54.01.8100.155.05.026.18
Chief Engineer (West) & Project Director, Bangladesh Railway, Rajshahi 22/05/2018 26/07/2018
12:30
Rajshahi
3 Request for Expressions of Interest (REOI) for Environment Specialist“(Contract Package BLPA S-6).
18.15.0000.023.14.054.18-459
Project Director 13/06/2018 12/07/2018
5:00 PM
Dhaka
4 Request for Expressions of Interest (REOI) for Social Specialist (National) (Contract Package BLPA S-7).
18.15.0000.023.14.053.18-1458
Project Director 13/06/2018 12/07/2018
5:00 PM
Dhaka
5 1.Bridge Design Engineer 2. Road Pavement Engineer 3. Senior Supervision Engineer and 4. AUTOCAD Operator
46.02.0000.900.14.067.18-232
Project Dircetor FDDRIRP 14/06/2018 11/07/2018
2.00 PM
Dhaka
6 Operation & Maintenance (O&M) of Existing Software based Computerized Weigh Scale (SSWIM & HSWIM) including web based Live Video & Data Monitoring system of Weigh Scale Station at Borodarogarhat, Sitakunda, Chattogram for 3(Three) years.
CZ-02/EOI/CTG/Axle/2017-18
Additional Chief Engineer, RHD, Chattogram Zone, Chattogram 14/06/2018 10/07/2018
12:30 P.M.
Chittagong
7 CZ-02/EOI/CTG/Axle/2017-18
CZ-02/EOI/CTG/Axle/2017-18
Additional Chief Engineer, RHD, Chattogram Zone, Chattogram. 18/06/2018 10/07/2018
12:30 PM
Chittagong
8 A) Feasibility Study for construction of railway line from (a) Chapainawabganj to sonamasjid, (b) Panchagarh to Banglabandha, (c) Domar to votemari via Jaldhaka as per TOR and (B) Feasibility study, detailed design and preparation of bid documents for construction of new railway bridge on Tista river beside the existing railway bridge as per TOR.
54.01.8100.155.05.042.15
Chief Engineer (West) & Project Director, Bangladesh Railway, Rajshahi 23/05/2018 08/07/2018
12:30
Rajshahi
9 For Selection of Local Consulting Firm to carry out for preparation following Monitoring & Evaluation Guidelines/Policy: 1. M & E Guideline on Crops, Fisheries and Livestock 2. M & E Guideline on Forestry and Irrigation 3. M & E Guideline on Education, Health & Nutrition, Family Welfare and Social Welfare. 4. M & E Guideline on Industry, Power & Energy 5. M & E Guideline on ICT and Related Field and 6. M & E Policy
21.060.006.00.00.087.2014-532
Project Director, SMECI (2nd Revised) Project, IMED 19/06/2018 05/07/2018
3:30 PM
Dhaka
10 Selection of International Financial Consultancy Firm for a Financial Solution of “Bay Terminal” based on the Feasibility Study and Master Plan of the same including carrying out followings: a. Prepare Financial Models for directing Loans of construction of Bay Terminal & Breakwater and reimbursements of the same. It should also include terms of Loans and reimbursements. It should also include selection procedures of operators and their terms (for loan reimbursements). b. Prepare Financial Models for PPP scheme contracting (concession contracting) and profit sharing of construction and operation of Bay Container Terminals and Breakwater. It should also include terms of concession contract. c. Any other Financial Models required for construction and operation of Bay Container Terminals and Breakwater. d. Analyze all the models and find the best solution. e. Assist Chittagong Port Authority to proceed with the solution until a contract is signed with any agency. f. Prepare all necessary documentation in this regard.
03/Executive Engineer/CCP/2017-2018
Executive Engineer/CCP 20/05/2018 04/07/2018
12:00 PM
Chittagong
11 Carrying out of the Hydrological and Morphological Study, Techno-economic feasibility and Environmental Impact Assessment(EIA) & Detail Engineering Design (Including Sub-soil Investigation, Topographical Survey, Preparation of Land Acquisition & Resettlement Plan for Approach/Access Road if required, Preparation of Structural Design, Cost Estimate, BOQ with bar bending schedule, Technical Specification, Tender Document etc with top supervision.) for 2 Bridges.
46.02.0000.7102.11.001.2018.485
The Project Director, Development of Important Rural Infrastructure Project(Phase-II) 30/05/2018 04/07/2018
2:00 PM
Dhaka
12 Event Management for Divisional and National Skills Competition 2018
40.05.0000.002.37.369.18.600
Chief Executive Officer (CEO), NSDC Secretariat 18/06/2018 03/07/2018
02.00PM
Dhaka
13 REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR APPOINTMENT OF INTERNATIONAL CONSULTANT FOR IMPLEMENTATION OF INDEPENDENT SYSTEM OPERATOR (ISO)
27.71.0000.00406.050.17-464
Power Cell 18/06/2018 03/07/2018
5:00 pm
Dhaka
14 Individual Consultants (National) under Different Position for Southern Country Iron Bridge Reconstruction & Rehabilitation Project (SIRP) 1. Sr.Bridge Design Engineer (1 persons) (36 months) 2. Mid Level Bridge Design Engineer (1Person) (36 months) 3. Supervision Engineer (6Person) (48 months) 4. Auto CAD Operator (2Person) (36 months)
46.02.0000.99.001.18
Md.Abdul Hai 14/06/2018 02/07/2018
2.00PM
Dhaka
15 Support Services
46.02.0000.001.99.18.01.05
Southern Country Iron Bridge Reconstruction & Rehabilitation Project, LGED (Level-5),62, West Agargaon, Sher-e-Bangla Nagar,Dhaka-1207 29/05/2018 26/06/2018
1:00 PM
Dhaka
16 Consultant for Preparation of Development of Project Proposal (DPP) and feasibility Study Report.
MFSP: 13.01.0000.362.11.205.18.652
Project Director 03/06/2018 26/06/2018
2PM
Dhaka
17 Feasibility Study for Construction of Circular Rail Line around Dhaka City
54.01.2600.011.14.001.18-13
Project Director, “Feasibility Study for Construction of Circular Rail Line around Dhaka City” Project 27/05/2018 25/06/2018
12:30 PM
Dhaka
18 Individual Consultants (National) under Different Position for Improvement of Ponds, Canals Across the Country Project (IPCP). 1. Engineering Survey Specialist. 2. Digital Survey Expert
46.02.0000.891.11.004.18.354
Md. Mizanur Rahman 24/05/2018 21/06/2018
2.00 PM
Dhaka
19 Financial Sector Support Project
BB-S21
Bangladesh Bank 27/05/2018 21/06/2018
05:00 PM
Dhaka
20 Project Implementation Support Consultant (PISC)
46.02.0000.786.24.008.18-93
Project Director 13/05/2018 20/06/2018
10:00 PM
Dhaka